Earlier this week, the partially assembled furnace was lifted into place onto the tilt platform just above the lower shell.  Read on for a photo and other activities around the EAF construction site.

In the photo below, the furnace is on top of the tilt platform. There is still a lot of work that needs to be done, but a great milestone for the team at Fairfield!

Furnace on Tilt Platform

Furnace is placed on the tilt platform

 

Adjacent to the melt shop, crews are making good progress inside the rounds caster area. Pillars are erected for the cooling bed that will be used for rounds exiting the caster.

Rounds Caster Cooling Bed Progress

Construction progress at the rounds caster cooling bed area

 

If you haven't done so, please subscribe to receive updates right in your email. Simply fill out the form at the top of this page and you can begin receiving new blog posts!

Topics: Electric Arc Furnace, Fairfield Tubular Operations, Alabama, EAF