Over the last few weeks, many of the critical parts of the electric arc furnace have been moved into place. Read on to see what is happening this week.
The tilt platform arrived on August 1st, and was transported via equipment specialized to carry wide loads into a construction site.
Tilt platform being moved towards the melt shop
The furnace's lower shell, which was assembled on the ground in a nearby building, arrived later in the week. Both pieces were lifted and put into place by a crane.
The assembled electric arc furnace's lower shell waiting for installation at the melt shop
If you haven't done so, please subscribe to receive updates right in your email. Simply fill out the form at the top of this page and you can begin receiving new blog posts!