As we wrap up the month of June, we turn our focus back to the bag house building. In the photo below, you can see concrete being poured into the formwork to cast the actual stack structure.
Concrete being pour into the bag house stack formwork
Below is a second view of the bag house. Gas collected from the electric arc furnace will be cooled and cleaned through a filter system within this facility.
Aerial view of the bag house