An important aspect to a safe and productive electric arc furnace is having a proper cooling system in place. This week, trenches are being dug by excavators to prepare for the installation of underground cooling water pipe. These 30-inch conduits will channel water to various parts of the operation to prevent overheating and malfunctions.
The excavator working on the trench to install cooling water pipe