Steel Talk - Electric Arc Furnace #1 Steelmaking Facility Construction Update

Construction Update from Fairfield - Part III

Posted by Tubular Marketing on Apr 12, 2019 10:40:05 AM

An important aspect to a safe and productive electric arc furnace is having a proper cooling system in place.  This week, trenches are being dug by excavators to prepare for the installation of underground cooling water pipe.  These 30-inch conduits will channel water to various parts of the operation to prevent overheating and malfunctions.

Excavation Work for Cooling Water Pipe

The excavator working on the trench to install cooling water pipe

Check back soon as we are constantly posting updates.  Be sure to subscribe by completing the form near the top of this page to get the latest progress report!

Topics: Electric Arc Furnace, Fairfield Tubular Operations, Alabama, EAF